xG Technology Inc. XMAXBSN25 Manuel D’Utilisation

Page de 19
BSN250 Guide
xG Technology Inc. Proprietary and Confidential Information
powering on the xmax bsn-250 
After the components of the base station are correctly mounted in the rack, follow these steps to turn the 
system ON: 
 Make sure the data, DC power, and antenna cables are connected to all units, the AC power cable 
(240 V main line) is connected, and the back power toggle switch is flipped ON, as detailed in the 
section 
Installing the xMAX BSN-250
.
 Flip the front power switch to the ON position. The red AC power lights on the power supply unit 
indicate when the AC power is ON. 
   
ATTENTION
Before turning the device ON, connect the antennas using the recommended coaxial 
cable to the chassis mount connectors installed on the rear of the sector units. The cables 
and antennas serve as a load to the xMAX BSN-250. Never turn the unit ON before 
installing the cables and antennas.    
3.   During power up, all LED indicators are turned on. As the control unit goes into boot mode, the System 
LED will remain yellow while the other LEDs are turned off. When the control unit processor enters run-
time mode, the System LED turns green if no faults are detected. Otherwise, the System LED turns red 
if faults are detected or if the control unit processor is unable to communicate with the i.MX. See the 
section Front Panel Status Indicators for the possible colors and meanings of the LEDs on each unit.
4.   Verify that both the System LED and Link LED indicator lights on the control unit are green. The base 
station is now ready for initial configuration.
1.
2.