Libelium Comunicaciones Distribuidas S.L. PARKING-V1 Manuel D’Utilisation
-35-
Device Installation
Step 3:
1RZWKHQRGHLVFRQȴJXUHG7XUQRWKHQRGH
Figure : Battery connection
Step 4:
%HIRUHFORVLQJWKHHQFORVXUHWKHQRGHPXVWEHSRZHUHGRQΖWLVPDQGDWRU\WKDWWKHQRGHLVSRZHUHGR
before this step. The node blinks the onboard red LED (1 second) and it will go to deepsleep state. In this state
the node must not be reset with the magnetic switch before the node is deployed. If it is reseted, the node
starts to work and will send frames, generating an unwanted consumption. Besides, the node would perform the
calibration process before it is in the real location.
the node must not be reset with the magnetic switch before the node is deployed. If it is reseted, the node
starts to work and will send frames, generating an unwanted consumption. Besides, the node would perform the
calibration process before it is in the real location.
Figure : LEDs blinking
Step 5: Now, the node can be closed. It is ready to deploy.