Libelium Comunicaciones Distribuidas S.L. PARKING-V1 Manuel D’Utilisation

Page de 67
-35-
Device Installation
Step 3:
1RZWKHQRGHLVFRQȴJXUHG7XUQR΍WKHQRGH
Figure : Battery connection
Step 4:
%HIRUHFORVLQJWKHHQFORVXUHWKHQRGHPXVWEHSRZHUHGRQΖWLVPDQGDWRU\WKDWWKHQRGHLVSRZHUHGR΍
before this step. The node blinks the onboard red LED (1 second) and it will go to deepsleep state. In this state 
the node must not be reset with the magnetic switch before the node is deployed. If it is reseted, the node 
starts to work and will send frames, generating an unwanted consumption. Besides, the node would perform the 
calibration process before it is in the real location.
Figure : LEDs blinking
Step 5: Now, the node can be closed. It is ready to deploy.