Landis+Gyr Technology Inc. ER6R1S4 Manuel D’Utilisation

Page de 77
Draft
Landis+Gyr
Chapter 2 - Setting Up Command Center 
User Guide
98-1723 Rev AB
17
 Figure 2 - 2. Process Settings
The Process Settings column heading include the following functions:
Enable. Select the check-box for the appropriate process to enable that function. Clear the 
check-box to disable the function.
Name. This column displays each function.
Occurs. This column displays the interval at which each function runs.
Time/Interval. This column allows the user to select a time for the appropriate function 
from the corresponding drop-down menu.
Last  Run. This column displays the last date and time that process was run.
Next  Run. This column displays the date and time of the next scheduled process.
Actions. This column displays a History icon in the Warehouse Update Process row. Click 
the History link to view the Process History (last 30 days) screen. IF there are any failed 
links in the Status column, click the link to view the reason why the task did not run. The 
Action column also displays a Run Now icon in most rows. Click the icon to immediately 
run the desired process.
The following process settings on the page apply to cellular meters:
Daily RF Reads Status Process: When readings are received from cellular meters, this 
process will update the information displayed on the Daily Reads Status report. From the 
drop down menu, select how frequently the information on the Daily Reads Status report is 
updated.
Dashboard Data Synchronization: Cellular meters will be included in statistics on the 
dashboards. This process can be used to keep the dashboard “in sync”. It is not enabled by 
default and will typically be used to process all the data aggregations for the dashboard by 
force. The default selection is daily at 6 AM.
Deployment Status: Cellular meters will be included in the statistics on the deployment 
status report. This process updates the deployment status report. The default schedule is