Hitachi Kokusai Electric Inc. SL24G-US-02 Manuel D’Utilisation

Page de 108
1. Read First
 
 
1-6 Required tools
 
13 
 
1-6
 
Required tools 
You will need the following tools to install this product. If you do not already have these tools, please purchase 
them separately.   
 
 
 
 
RJ45 crimping tool 
 
 
Recommended product 
(1) Tyco Electronics AMP 2-231652-1 
(2) IDEAL 30-521 
 
 
 
 
Phillips head screwdriver No. 2 
(or M5) 
 
 
 
Use during installation. 
 
 
 
 
Torque wrench 
(for the M6 metal mounting 
bracket bolts) 
 
 
 
Use during installation. 
We recommend that you use a tool with torque control.   
 
 
 
 
LAN cable qualification tester 
 
 
Use to check the quality of LAN cables swaged to wires and 
the RJ-45 connectors.   
Poor swages cannot be detected through a conduction 
check. Use a LAN cable qualification tester that is capable 
of verifying the quality of a 100BASE-TX cable.   
 
Recommended product 
(1) Fluke CIQ-100 
 
 
 
 
Vinyl tape, self-adhesive tape 
 
 
If installing outdoors, wrap the tape around the drip-proof 
cap.  
 
 
 
 
Binoculars 
 
 
Use if the opposed device is a long way away and the 
installation location is not visible.   
 
 
 
 
Monitor cable 
(Optional items available from 
Hitachi Kokusai Electric) 
 
Product name: SL-monitor cable 
Model: HP5-010601 
 
 
 
Use to adjust the antenna direction when monitoring the 
receive level. Use this cable to connect the received power 
monitor terminal and the digital multimeter.   
 
 
 
 
 
Torque wrench 
(Size 3mm for M4 hexagon socket 
bolts)
 
 
 
Use to open and close the lid of the received power monitor 
terminal.  
We recommend that you use a tool with torque control.   
 
 
 
 
Digital multimeter   
 
 
Use to adjust the antenna direction when monitoring the 
receive level. DC: 0 to 3.3V  Accuracy: Use a meter that 
can measure at 1.5%.