Outsite Networks Inc. APX-2012 Manuel D’Utilisation
AllPoints Keypad Installation Manual
Page 4
1. Electrical Connection Specifications
Instructions and Standards
1. Read this guide completely prior to installing the AllPoints Keypad Printer.
2. All Electrical connections must comply with the following:
Equipment must be installed and used in accordance with the National
Electrical Code (NEC), and the National Fire Protection Association
(NFPA) – Automotive and Marine Service Station Code.
(NFPA) – Automotive and Marine Service Station Code.
Equipment must be installed in compliance with the instructions set forth
in this manual.
3. This manual contains wiring diagrams, drawings, and photographs to assist in
the proper installation of the AllPoints Keypad Printer. Any questions
regarding this manual or the proper installation of the AllPoints Keypad
Printer should be addressed to Outsite Networks, Inc. at 800-371-1118.
regarding this manual or the proper installation of the AllPoints Keypad
Printer should be addressed to Outsite Networks, Inc. at 800-371-1118.
2. Power Specifications
AC Input
115/230V~, 8/4A, 60/50Hz
3. Provided Materials
AllPoints Keypad Printer(s)
A/C Power Cable
AllPoints Keypad External Power Supply
4. Optional Materials per configuration requirements
Double Data Monitor(s)
14’ RJ45 Cat5 Cable(s)
2’ RJ45 Cat5 Cable(s) (used for Data Monitors)
DB-25 to RJ45 Converter (Male and Female used for connecting Serial
Printer or Scanner Dual Data Monitors)
DB-9 to RJ45 Converter (Male and Female used for connecting Serial
Printer Dual Data Monitor)