Theory of Operation
SENTINEL Meter Technical Reference Guide
4-11
Block Interval Demand Calculation
Block Demand calculations are based on user-defined interval lengths. The 
demand is the total energy accumulated during the interval divided by the length of 
the interval. At each end of interval (EOI), demand calculations are made and 
“EOI” can be displayed on the LCD.
For block interval, demand calculations are made at the end of each completed 
demand interval. This method is similar to the way mechanical demand meters 
operate. As load is applied to the demand register, an indicating pointer and 
maximum demand indicator are driven upscale. At the end of each interval, the 
indicating demand pointer is returned to the zero position, and the maximum 
demand pointer retains its highest or maximum position.
Rolling/Sliding Demand Interval Calculation
A selected number of subintervals make up the demand interval. At the end of each 
subinterval, new demand calculations occur based on the last full demand interval 
and “EOI” can be displayed on the LCD.
The following quantities can be selected for rolling demand: W d, W r, W net, Var 
Q1-Q4, VA d (arithmetic or vectorial), and VA lagging.
Block interval demand calculation is subject to peak splitting, whereby it is 
possible for an electricity consumer to manipulate the load for limited periods 
within the demand interval. The registered demand reading will be less than the 
actual maximum demand of the load.
To counter this situation, the concept of rolling demand was introduced.  Rolling 
demand is calculated as follows:
1
For illustration purposes, assume a 15 minute billing demand interval with 
three five-minute subintervals has been selected.  Then, at any given moment, 
the meter has three complete sets of five minute information available for 
demand calculations.
2
At the end of the present five minute subinterval, the information on the oldest 
five minute subinterval is discarded, and demand calculations are performed 
on the three newest sets of subintervals. In this manner, the SENTINEL meter 
with the rolling demand option updates the demand calculations every five 
minutes.
3
If the billing demand interval is 30 minutes with five minute subintervals, then 
six sets of five-minute information or updates will be used for calculating 
previous demand.
Thermal Emulation
The SENTINEL meter will emulate the response of a thermal demand meter for kW 
and kVA. This type of demand calculation is approximated exponentially. The 
meter will record 90% of a change in load in 15 minutes, 99% in 30 minutes, and 
99.9% in 45 minutes. The four characteristics of a thermal demand meter that the 
SENTINEL meter will emulate are:
Arithmetic phase summation
Continuous rolling average demand
Response calibrated to RMS values
No End-of-Interval (EOI)