 PERFORMANCE TESTING
Page 6-2
T6M SERIES MOBILE SERVICE MANUAL – SM/16/1.0
6.1 Introduction
The following sections detail basic field testing requirements of the mobile to confirm
correct RF operation.  These tests should be performed on a low, a middle and a
high channel to ensure that the RF performance is consistent across the mobile’s
entire range.  Whilst these tests do serve to indicate the nominal RF performance,
there are relatively few adjustments available to field personnel, so mobile’s failing to
meet these basic tests should be returned to the supplier for correct repair or
retuning.
6.2 Test Equipment
The tests require the following equipment:
 Bench Power Supply
 Digital Multimeter
 RF Power Meter
 Oscilloscope
 RF Signal Generator
Ensure that the range measurement capabilities of each item is appropriate for the
mobile under test.  Suitable alternatives, such as a comprehensive RF test set, may
be substituted where available.
6.3 Power Supply
For this test and all others, ensure that the mobile is connected to a nominal 13.2V
DC supply.
1. With the mobile configured to operate normally, check that the mobile
draws <100mA when it is switched off.
2. Turn the mobile on and check that the mobile draws <2A when in normal
standby mode (receive mode, muted).
6.4 Transmitter
1. Place the mobile into test mode (for details of test mode operation, please
refer to Section 5.9).
2. Key up the mobile and, with no modulation applied, check the following:
I. Current draw is <6.2A
II. Transmit power is >7W and <10W
III. Transmitter frequency is within 1.0ppm