BI TAD001 Manuel D’Utilisation

Page de 16
FCC Specifications & Product Installation
BI TAD
4
Proprietary & Confidential
™
Male Hinge
™
Female Hinge
™
Joint Pin
™
2 Locking Pins
™
Battery
™
Battery Hatch
™
Battery Cover
™
Adjustable Strap
™
Fixed Strap
™
2 strap clamps
™
Unit Case
To assemble the TAD unit
1.
Insert the battery into the battery well.
2.
Place the battery hatch inside the battery well. Using a screwdriver, rotate the battery 
hatch clockwise until the battery is secure.
3.
Slide the battery cover over the battery hatch.
4.
Slide the fixed strap into the fiber‐optic connection bay opposite of the charging port.
5.
Slide the adjustable strap into the other fiber‐optic connection bay.
6.
Using a Phillips screwdriver, secure the straps between the unit case and the strap clamps 
with the provided screws. Place one screw into each hole, and rotate each screw 
clockwise until you feel resistance.
7.
Assemble the joint of the male and female hinges using the joint pin. Slide the joint pin 
through the hinge loops until the joint pin is flush with the hinge assembly.
Sizing
Size the TAD unit while the client is standing. It must be installed on the narrowest part of
the bare ankle.
To size the TAD unit
1.
Wrap the adjustable strap around the client’s ankle and inside the fixed strap.
2.
Wrap the fixed strap around the client’s ankle and on top of the adjustable strap.
3.
Note the sizing number on the adjustable strap that is closest to the fixed strap. For an 
accurate strap measurement, the absorption sensor must be firmly pressed against the 
client’s ankle with a 50% depression into the absorption sensor cavity.
4.
Remove the unit from the client’s ankle.