This chapter describes the steps required to install ILS Open Plus Exit Antennas (hereafter
referred to as gates) for Intelligent Library System Open Plus 3.0.
referred to as gates) for Intelligent Library System Open Plus 3.0.
Requirements
The field service technician requires:
•
A laptop computer running Windows with a Serial connector.
•
The typical hardware and tools to mount a gate for various floor substrates.
•
The size of the mounting holes in the gate is 10 mm (.39”). The length of the anchors or
bolts should be selected such that they extend at least 45 mm (1.8”) and a maximum of
65 mm (2.6”) from the floor.
bolts should be selected such that they extend at least 45 mm (1.8”) and a maximum of
65 mm (2.6”) from the floor.
•
DB9-to-RJ45 adapter, supplied with the gates
•
Service technicians will add terminators when connecting to the terminal block. The
power supply connections are connected in the same manner.
power supply connections are connected in the same manner.
•
Service technicians will pull the wires, strip, add the appropriate terminators, add the
toroid (supplied with the gate), and make all connections.
toroid (supplied with the gate), and make all connections.
•
The Service technician supplies all connectors.
Overview
The following is the installation sequence. Following this are the detailed instructions
procedures for each component.
procedures for each component.
1
2
3
4
5
6
7