Siklu Communication Ltd. SK-MH60GE-A1 Manuel D’Utilisation
MultiHaul Installation Manual
Page 17
2.5
Mounting the MultiHaul
1.
Elevation Lock Bolts (2 additional bolts at opposite side of the ODU)
2.
Mounting Kit
3.
Worm Clamp fixing points
Figure 2-1 Mounting Bracket
1. Mount the ODU and the Mounting Bracket on a fixed reinforced steel mounting
pole with 2-4 inches diameter.
2. Use worm clamps (steel bands) to secure the bracket to the mounting pole.
3. In order to allow free movement when pointing the antenna, unlock the
Elevation Lock Bolts.
4. Verify visually that the ODU is pointing to remote site. Optimize the Azimuth
alignment by turning the mounting bracket (make sure the worm clamps are not
tightened) and change the Elevation alignment by moving the ODU up and
down.
tightened) and change the Elevation alignment by moving the ODU up and
down.
5. Once optimum achieved, fasten the worm-clamp to secure the bracket to the
mounting pole and tighten the Elevation Lock Bolts.
Alignment is now completed. The system’s scanning antenna will automatically alig n
the beam for optimal performance.
the beam for optimal performance.