Siklu Communication Ltd. SK-MH60GE-A1 Manuel D’Utilisation

Page de 34
MultiHaul Installation Manual 
Page 20 
2.6.3 
 Preparing the Cables 
Before inserting a cable connector into the ODU, you must first enclose the cable 
connector in a protective All-Weather shell. Three sets of All-Weather shells are 
provided with the ODU for the ODU interfaces.   
 
Figure 2-4 All-Weather Connecting Cable Shell Assembly 
The provided protective All-Weather Shells fit cables from 3.5mm to 9.0mm diameter. 
1. Thread the cable and tight the shell to the ODU firmly by hand (do not use tools). 
2. Insert the rubber gasket snugly and tight the connector lock. 
Caution: 
 
To avoid accidental damage to the connector, when removing the All-Weather Shell, 
unlock the gland first. 
2.7 
System LEDs 
LED 
Color 
Description 
PWR (Power) 
Green – Power ON 
Blink Green – booting up 
Orange – Booting up (2 seconds) 
Boot failure if continues) 
Red – Power Failure 
 
Off – No Power  
 
RF 
Green – At least one station 
associated 
Device under association, no 
station yet associated 
Off – Link Down 
 
ETH1/2/3: 
Green – Link 1G 
 
Orange – Link 10/100 
 
Off – No Link (Carrier) 
 
BT 
 
For future use