Baicells Technologies Co. Ltd. MBS1105 Manuel D’Utilisation

Page de 31
Baicells mBS1105 Base Station Installation Guide(V100R001C00,02).docx 
 
Figure 3-1 Installation Space Requirement 
 
 
 
Personnel Requirements 
3.4
The installation personnel must master the basic safe operation knowledge, through the 
training, and having the corresponding qualifications.. 
 
Lightening and Grounding Protection 
3.5
CAUTION
It is unlikely to happen but since the LTE eNodeB is very sophisticated equipment 
so we would recommend you to test it on the ground to make sure everything is 
functioning before install on the tower. 
The  operator  must  prepare  external  lightning  protector  to  protect  the  GPS,  external 
antenna and RJ-45 port. 
Grounding Notes: 
 
The ground wire adopts yellow-green wire that is no smaller than 16 mm². 
 
Grounding principle: as near as possible. 
 
The eNodeB connects to the reliable outdoor grounding point (earth) through one 
ground screw.