Gw Instek GPT-9603 Insulation measuring device, GPT-9603 Manuel D’Utilisation

Codes de produits
GPT-9603
Page de 75
 
 
GPT-9600 Series User Manual 
42
 
Setting the Test Voltage and Running a Test 
 
Background 
The test voltage can be set when the tester is in 
the READY status. After the test voltage has 
been set, the test can then be run. 
 Note 
The tester cannot start to run a test under the 
following conditions: 
 
The INTERLOCK function is ON and the 
Interlock key is not inserted in the signal I/O 
port (page 56).  
 
The STOP signal has been received remotely. 
If Double Action is ON, ensure the START 
button is pressed immediately after the STOP 
button (<0.5s). See page 56. 
Steps 
1.  Connect the DUT to the tester. 
2.  Ensure the tester is in READY 
status and that all the testing 
parameters have been set for the 
test.  
From Page 
30 
 
 
     
 
 
 
H = 2 2 . 0 m A  
 
 
 
 
m A
L
0
=
0 0
.
   
7 4 S  
 
 
 
 
 
= 1
T
       
   
CW
D
A CW
R  
I
D
O E
M
T M E
I
READY Status
 
1 00
 
k V
A
E
R
 
D
 
Y
A
m
 
 
3.  The READY indicator will be lit 
blue when in the READY status. 
READY