Beha Amprobe AC50A-D Digital-Multimeter, DMM, 3454543 Fiche De Données

Codes de produits
3454543
Page de 78
Operation
Preparation and safety measures
Installing the battery
Before using the instrument, the battery must be installed. This is carried 
out as follows:
1) Separate the instrument from any circuit, and remove the test leads.
2) Open the housing by removing the screw on the rear face.
3)  Fit the new batteries (2 type 1.5 V IEC LR6), taking care that the polarity 
is correct. Make sure that no wires are trapped between the 2 halves 
of the housing, and close it again.
4) The instrument is now ready for use.
•  The selector switch must be turned to the desired type of measurement 
before the probes are connected to the unit under test (UUT).
•  Before switching to a new function, the probes must always be removed 
from the UUT.
•  Use the instrument only in clean and dry surroundings. Dirt and moisture 
reduce the effectiveness of the insulation, with consequent danger of 
electric shock, specially when dealing with high voltages.
•  Use  the  instrument  only  in  the  specified  ranges.  Before  making 
measurements, verify that the instrument is functioning properly, for 
example by testing on a known voltage or current. Make sure that the 
test leads are undamaged.
5