Mounting the Power System 
Location and Environment 
Data Power Solutions (rack-mounted and desktop versions) meet the safety and fire 
enclosure requirements (as specified in AS/NZS 60950.1, EN 60950-1, IEC 60950-1 and 
UL 60950-1). 
•  Rack-Mounted Versions: APS3-05X and APS6-05X series power systems may be 
mounted in 19-inch wide host equipment racks (enclosed or open type) securely bolted 
to the floor. 
•  Desktop Versions: APS3-06X series power systems may be positioned on any surface 
that supports the weight of the power system. 
The location must provide adequate airflow around the unit, (as per Clearance Requirements 
below) in an atmosphere free from excessive dust, corrosive fumes, or conductive 
contaminants. 
Dust build-up within the DC power system may cause premature failure. In dusty 
environments filter the ventilation air entering the equipment room. Ensure regular cleaning 
of the air filters. 
VRLA lead acid batteries can emit explosive gases and must be installed with adequate 
ventilation. Refer to the battery manufacturer or supplier for advice on minimum ventilation 
levels, or refer to Application Note AN0080 available from Eaton. 
Clearance Requirements 
All Data Power Solutions (rack-mounted and desktop versions) require the following 
minimum clearances: 
•  Front and Rear Clearance – 50 mm (2”) from walls and other equipment, required for 
optimum system cooling and access. 
•  Top and Bottom Clearance – None 
Rack Installation (rack-mounted versions only) 
1
2
 
APS3-05X and APS6-05X power systems come 
pre-assembled with two 19-inch rack-mounting 
brackets. 
#
 
The two rack-mounting brackets can be moved 
backwards and lined up with alternative 
bracket-mounting holes, to provide greater 
mounting flexibility. Ensure the same screws are 
used.