Exide DEC200 Manuel D’Utilisation

Page de 20
Sales 
• Service • Recycling 1-888-563-6300
 
 
3
2. INTRODUCTION 
 
The GNB
® DEC200 battery chargers are fan cooled, solid state, microprocessor 
controlled, SCR regulated chargers designed to make battery charging simple. They 
are designed to charge flooded lead-acid batteries. The charger has a 
comprehensive self-checking diagnostic program to control all charger functions, 
monitor the quality of charge and check its own safety conditions. 
 
3. RECEIVING 
CHARGER 
 
Examine the charger thoroughly before using, to make sure that no parts have been 
loosened or damaged during shipment. Check the contents of the package against 
the delivery slip before disposing of the shipping package. If any shipping damage or 
partial loss is found, file a claim with the carrier without delay and take any necessary 
steps to protect your rights. Before installing, check that the charger nameplate data 
corresponds to the packing slip and to the model specified on the original sales 
order. The DEC200 chargers are delivered on skids for easy handling using a forklift 
truck. 
 
4.  LOCATION AND INSTALLATION OF CHARGER 
 
Proper installation is important in order to achieve good charger performance and 
long trouble free operation and to prevent damage to the charger and batteries. The 
charger should be located in a clean, cool, normal ambient room temperature 
(between +32
o
F/0
o
C and 104
o
F/40
o
C), dry and well-ventilated area. In order to permit 
free air flow for convection cooling allow four inches minimum between the charger 
and any wall, six inches from other equipment, and never store anything beneath or 
on top of the charger. 
 
5. STACKING 
 
The following recommendations should be taken into consideration when stacking 
these units:  
 
a)  The base unit should be secured to the floor or a solid base using appropriate 
bolts and with accordance to local building codes and regulations. 
 
b)  These units can be stacked to a maximum 3 high. 
 
c)  If a lifting sling is used, the sling should be placed under the unit where the base 
plate is located to avoid damage to the units. 
 
Lifting Sequence is as follows: - 
 
a)  Secure the base unit to the floor or solid base.  The bolts can be accessed and 
secured from the underside of the unit at the front and rear or from inside the unit 
where the large holes are located directly above mounting holes (see appendix G 
for mounting hole locations). When accessing the mounting holes from the 
inside, it is recommended you use a long handle hexagon key or screwdriver with 
the hexagon key inserted. This will allow you to go through the base plate to the 
bolts, which are located on the flange.