Windster PowerApp.web 100 Manuel D’Utilisation
2
Dell PowerApp 100 Appliances Rack Installation Guide
Rack Kit Contents
The rack kit includes the following items (see Figure 1):
•
Two center-mount brackets
•
Four 10-24 x 0.375-inch pan-head Phillips (or slotted) screws
•
Two 12-24 x 0.5-inch pan-head Phillips screws
Figure 1. Two-Post Center-Mount Rack Kit Contents
Recommended Tools and Supplies
You need the following tools and supplies to install the system in a two-post open-
frame relay rack:
frame relay rack:
•
#2 Phillips screwdriver
•
Masking tape or a felt-tip pen, for use in marking the mounting holes to be used
Marking the Rack
1.
Determine where you want to place the bottom of the PowerApp 100 system.
CAUTION: If you are installing more than one PowerApp 100 system, install
the first system in the lowest available position in the rack.
the first system in the lowest available position in the rack.
2.
Mark the upper and lower-mounting positions on the two posts.
Each 1-U (1.75-inch) vertical space has three holes, with center-to-center spacing
between holes (beginning at the center of the top hole of a 1-U space) 0.625,
0.625, and 0.5 inches (see Figure 2).
between holes (beginning at the center of the top hole of a 1-U space) 0.625,
0.625, and 0.5 inches (see Figure 2).
center-mount brackets (2)
12-24 x 0.5-inch pan-head Phil-
lips screws (2)
lips screws (2)
10-24 x 0.375-inch pan-
head Phillips screws (4)
head Phillips screws (4)