Sterling Kitchen Utensil 1200 Manuel D’Utilisation

Page de 85
BJ5-615 
Chapter 3: Installation 
23 of 85 
 
Chapter 3:  Installation 
3-1  Uncrating the Equipment 
 
Requirements at Application Site 
Check the application site to make sure it conforms to the qualifications listed below. 
• 
The site is an enclosed space. 
• 
The ground has sufficient load-bearing capacity (Refer to “Technical 
Specifications” in the Appendix for machine weight). The unevenness of the 
ground surface may not exceed 5 mm. 
• 
The machine must be freely accessible from all sides. 
• 
There must be sufficient room available for operating and service personnel.  
• 
Spatial requirements: Refer to “Drawing and Diagrams” in the Appendix for 
machine dimensions . All hinged parts must be able to be opened 
completely. 
• 
Vibration-free environment. 
• 
The site has sufficient lighting. 
• 
The machine may not be exposed to direct radiation caused by radiators or 
the sun. 
• 
Room temperature:  +41 to 104 °F (+5° to +40°C) 
• 
Relative atmospheric humidity according to DIN 40040:  
15 to 70 % (indoor) 
 
NOTE:  By humidity levels higher than 70 %, apply anticorrosive agent 
to the metallic-finished machine parts. Insulation for the 
tropics is also necessary. 
• 
The machine may not be operated within range of static discharges or strong 
magnetic fields as this could lead to faults in the machine control system. 
 
 
Unloading and Installing the Machine 
The machine and components are packed so they arrive safely. Use a suitable crane or 
forklift for unloading the packaged machine and/or components. 
 
1.  Remove the packaging material and all transportation safety devices after 
unloading the machine. 
2.  In the case that the shredder and its accessory components have been 
delivered as individual items, mount them at the site of application in 
accordance with the Assembly Drawing.  This is the only way to 
guarantee there are sufficient piping parts, tubing, and cable connections, 
and that the linking places match.