Premier Floors Manuel D’Utilisation

Page de 56
16
Use only one nail into each 4’ spline to hold it 
in place.  Do not nail off the spline until the next 
panel is in place.  Refer back to the connections 
section for proper mastic placement. 
Before placing the panels on the floor support 
beams, tack a dry-line spaced 1/2”–3/4” out 
from the entire length of the support beam.  
Use temporary bracing to help hold these 
beams in place.  When setting the panels, make 
sure the beam stays straight by checking your 
string line. 
Start by placing your first panel on a corner.  
Use Premier Panel Screws as shown on the 
shop drawings or described by the engineer 
of record, to attach the first panel to the 
supporting beams.  Do not tighten the screws 
on the edges of the panels until your rim board 
is in place.  Also, leave the last two screws on 
the leading edge loose until you have set your 
next panel.  Once the next panel is in place, 
screw the previous one tight and repeat the 
process.  Install blocking for point loads per 
engineered plans as shown above to the right.