Toshiba 18 - 1250 A Manuel D’Utilisation

Page de 99
TE Series        
          Digital Solid State Soft Starters   18 – 1250A 
1.1.2 
Advanced Motor Protection Features 
Thermal Model Electronic 
Overload Protection 
A sophisticated Thermal Model of the motor operation is created in the 
microprocessor to accurately track all starting, stopping and running conditions 
to provide maximum motor protection. 
Two Stage  
Overload Curves 
Starting: Programmable for Class 5 or 10  
Run: Programmable for Class 5 through 30 when "At-Speed" is detected. 
Overload Reset  
Manual (default) or automatic 
Retentive Thermal Memory 
Overload circuit retains thermal condition of the motor regardless of control 
power status. Unit uses real time clock to adjust for off time. 
Dynamic Reset Capacity 
Overload will not reset until thermal capacity available in the motor is enough for 
a successful restart. Starter learns and retains this information by monitoring 
previous successful starts. 
Current Imbalance Trip  
Trip Level: 5 - 30%  Imbalance in any two phases  
Trip Delay: 1 -20 seconds 
PTC Input Trip 
Trips on greater than 750 ohms resistance on a dedicated PTC input. Can be 
used with an Emergency Stop or any other External Lockout. 
Over Current Trip 
(Electronic Shear Pin) 
Trip Level: 50 - 300% of motor FLA 
Trip Delay: 1 - 20 seconds 
Phase Loss 
Trips on any phase current less than 20% of unit rating.  
Can be disabled in programming for testing with smaller loads. 
Equipment Ground Fault 
Protection 
Type: Residual Current Trip 
Range: 5 – 90% of unit CT ratio 
Trip Delay: 1 – 60 seconds 
Load Loss Trip 
Under Current Trip Level: 10 –90 % of motor FLA 
Trip Delay: 1 – 60 seconds 
Coast Down (Back Spin) 
Lockout Timer  
Prevents restart when motor may be spinning backwards 
Coast Down Time Range: 1 – 60 minutes 
Starts-per-hour Lockout 
1 – 10 successful starts per hour 
Minimum Time between 
Starts Lockout  
Range: 1 – 60 minutes between start attempts 
Restart Delay 
Sequential Start Feature for restarting delay after a power outage. 
1-999 seconds after a power loss 
Auto Reset 
Can be programmed to attempt resetting after selected faults 
0 – 10 Attempts, 0 – 999 minutes delay between attempts 
Power Device Monitoring 
Shorted SCR Lockout (1 shorted SCR) and independent Shunt Trip (multiple 
shorted SCRs). Can be disabled in programming.