HP Performance Optimized Data Center (POD) 40cp Instruction De Maintenance

Page de 79
 
Removal and replacement procedures  54 
3. 
Remove the LED light assembly (2). 
 
 
Replacing the LED light 
1. 
Place the LED light where you want to secure it (1). 
2. 
Insert the screws (2). 
3. 
Reconnect power to the LED light. 
 
 
Temperature sensor (cold aisle) 
The HP POD 40c NA contains six temperature sensors in the cold aisle. 
 
You need a screwdriver and scissors for installation.