Emerson Liebert DS Precision Cooling System 28-105kW Manuel D’Utilisation

Page de 32
Installation Checklist
13
3.0
I
NSTALLATION
 C
HECKLIST
___ 1. Liebert Air Economizer received, unpacked and checked for damage.
___ 2. Liebert Air Economizer positioned and secured to indoor cooling unit.
___ 3. Duct work to outdoor opening properly sloped to prevent precipitation and dust infiltration.
___ 4. Outdoor air duct opening properly screened to prevent vermin from entering.
___ 5. Outdoor air duct opening protected against human intrusion.
___ 6. Filters installed in air intake duct work.
___ 7. Restricted airflow switch settings made
___ 8. Low voltage connections made.