Cornelius 569000689 Fascicule

Page de 2
1
569000338
Page 1 of 2
January 23, 2002
Revised: October 9, 2003
IMI CORNELIUS INC  
g  One Cornelius Place   g  Anoka, MN 55303-6234
Telephone (800) 238-3600                                      Facsimile (800) 535–4231
INSTALLATION INSTRUCTIONS FOR
PRESSURE SWITCH PCL KIT (569000689)
Table 1. Loose-Shipped Parts
Item
No.
Part No.
Name
Qty.
1
560002361
Board Circ Prod Delivery
2
2
560004158
Chip Micro EPROM Main
1
3
560002360
Board Circ Oper Interface
1
4
560006424
Switch Press Syr 30-37 PSI
2
5
560005312
Fitg T 7/16-20 x 1/8-FPT
2
6
560002318
Fitg Push PI4512F4S .375 x .25
4
7
560006985
Harn Adaptor Press Switch
2
8
560002388
Tube Prod .250 I.D. x 22-1/2”
1
9
560002389
Tube Prod .250 I.D. x 20-1/2”
1
10
560002339
Clip Flow Bend .375 O.D. Tube
2
11
4417
Clip Lock .375 O.D. Push-in Fitg
4
12
690945000
Tie Cable
2
1. Obtain wakeup time, sleep time, defrost times, and viscosity settings from current setup.
2. Disconnect power (unit may have to be pulled from wall to access electrical outlet).
3. Shut off syrup supply by shutting down CO
2
.  Bleed CO
2
 from inlets to BIB pumps.
4. Remove left side, front access and rear panel.
5. Remove No. 1 cylinder syrup inlet line and No. 1 syrup flow sensor assembly (leftmost if facing unit).
6. Install new syrup inlet line (2 flavor OC unit), or connect existing line with tubing elbow and cable tie (2 and
4 flavor standing units) to pressure switch assembly (see Figure 1).  Assemble locks onto pressure switch
assembly and reconnect electrical harness paying close attention to maintaining wiring integrity.  Switch is
supplied with adapter harness to retrofit existing wiring (wires to be attached to “C” common and “NC” nor-
mally closed.  Note: some parts will be left over.
7. Repeat steps 5 and 6 for No. 2, 3 and 4 syrup inlet lines and syrup flow sensor assemblies.
8. Remove existing main control board EPROM chip using an EPROM extraction tool.  Install EPROM taking
great care not to misalign pins or cause damage to chip.  Note: wearing ground strap is stronly recom-
mended to protect board from electrostatic discharge
.  Take care to put each connector back in its
proper location.
9. Remove existing No. 1 cylinder product delivery board.  Install new product delivery board (using ground
strap).  Take care to put each connector back in its proper location.
10. Repeat step 9 for product delivery boards No. 2, 3 and 4.