Bosch DKE96 Manuel D’Utilisation

Page de 28
English 4
Power Requirements
Electrical Specifications: 120V AC, 60Hz. 15A Branch Circuit
Installation Procedure
WARNING:
 To avoid electrical shock hazard, before installing, 
switch power off at the service panel and lock the panel to prevent the 
power from being switched on accidentally.
1) Unpack Hood
Pull hood from outer packaging. Remove and discard all packaging materials. 
Remove filter and set aside (See Use and Care manual for removal instructions).
2) Prepare ductwork
Install one-way damper so that the flap opens up. Press damper down into the 
blower outlet until it is snug. Note: verify that the flap opens up (toward the ceiling) 
before continuing. See “Prepare Ductwork” on page 4. If necessary, install transi-
tion, thermal break and additional backdraft damper.
3) Prepare Wall
See “General Information” on page 2 for recommended installation height and 
“Mounting Requirements” on page 3 for information on wall requirements.
Once the preferred height is determined, draw a line at the vertical centerline of 
the cooking appliance.
Use the installation template to locate and mark the screw holes. Drill 1/4” (6 mm) 
pilot holes (4 holes for hood screws and 2 holes for chimney screws). Install plugs 
 Figure 2: Prepare Ductwork