Benq MP720 Manuel D’Utilisation

Page de 61
Positioning your projector
14
I. Floor front
Select this location with the projector placed near the 
floor in front of the screen. This is the most common 
way to position the projector for quick setup and 
portability.
II. Ceiling front
Select this location with the projector suspended 
upside-down from the ceiling in front of the screen.
Purchase the BenQ Projector Ceiling Mounting Kit 
from your dealer to mount your projector on the 
ceiling.
Set 
 in the Advance > Mirror menu after you turn 
the projector on.
III. Floor rear
Select this location with the projector placed near the 
floor behind the screen.
Note that a special rear projection screen is required.
Set 
 in the Advance > Mirror menu after you turn 
the projector on.
IV. Ceiling rear
Select this location with the projector suspended 
upside-down from the ceiling behind the screen.
Note that a special rear projection screen and the 
BenQ Projector Ceiling Mounting Kit are required 
for this installation location.
Set 
 in the Advance > Mirror menu after you turn 
the projector on.