Beckett CG10 Manuel D’Utilisation

Page de 32
13
CG10 Burner Manual
Initiate – The primary control enters the INITIATE 
sequence when the control is fi rst powered on or 
power returns after an interruption. The initiate 
sequence is a ten second delay during which the 
control verifi es line voltage stability. 
Standby – The control enters STANDBY until the 
limits, operating limit control, burner switch, and all 
microcomputer-monitored circuits are in the correct 
state.
Load demand – Operating limit control contacts 
close on drop in temperature (or pressure) and 
initiates the start sequence.
Prepurge – The control will signal the PREPURGE 
sequence when the airfl ow interlock and all 
switches are in the correct state. The Prepurge 
sequence is the amount of time the blower motor 
runs prior to the ignition start sequence. Timing for 
the Prepurge sequence is determined by a card 
mounted inside the control module (typically 30 
seconds).  
Trial for ignition (TFI) – After the Prepurge 
sequence has timed out, the ignition and main gas 
valves will be energized.  Because the burner has 
direct spark ignition for the main fl ame, the fl ame 
must be established and detected by the control 
within 4 seconds or lockout will occur.  
Run – With a fl ame established and the control 
continuing to detect a fl ame, the burner will operate 
in the RUN mode until the load demand is satisfi ed 
or a limit opens. 
Load Satisfi ed – The fuel valves are closed.  After 
a 15 second post purge, the burner switches to idle 
until the next call for operation.
1.
2.
3.
4.
5.
6.
7.
Sequence of Operation
(Typical for RM7897A fl ame safeguard primary control)
Section: Sequence of Operation & Prepare the Burner for Start-up
This operation sequence is 
typical and for reference only. The 
primary control could vary, depending on the customer 
specifi cation and code requirements.  For the specifi c 
operating sequence that applies to your installation, 
consult the appliance manufacturer’s directions, wiring 
instructions, and control manufacturer’s literature 
supplied with your burner.
Prepare the Burner for 
Start-up
Professional Installation 
& Service Required
Incorrect installation and mishandling 
of start-up could lead to equipment 
malfunction and result in asphyxiation, 
explosion or fi re.
This burner must be installed and prepared for start-
up by a qualifi ed service technician who is trained 
and experienced in commercial gas burner system 
installation and operation.
Do not attempt to start the burner unless you are 
fully qualifi ed.
Carefully follow the wiring diagrams, control 
instruction sheets, fl ame safeguard sequence 
of operation, test procedures and all appliance 
manufacturer’s directions that pertain to this 
installation.
If any of these items are not clear or are unavailable, 
call Beckett at 1-800-645-2876 for assistance.
y
y
y
y
Delayed Ignition, Explosion 
and Fire Hazards
This is a direct spark ignition burner and 
by code requirements must have a primary 
control with a 4-second fl ame establishment 
period.  Exceeding 4 seconds could result in 
delayed ignition, explosions and fi re.
Always verify the primary control has a 4-second fl ame 
establishment period by carefully following the control 
manufacturers’ confi guration instructions.
Example: Honeywell RM Series requires clipping and 
removing the JR1 resistor.