GE Mark Controls Upgrades Fiche De Données

Page de 2
Mark VI Training Simulator
Introduction
Improve the effectiveness of your operations and maintenance 
with GE Energy’s Mark VI Training Simulator. The training 
simulator uses your actual site-specific application software 
and operator screens to drive the turbine simulation. 
Operators can refresh their knowledge of commands and 
system responses on a replica of the actual turbine control – 
with no risk to the turbine. Training can occur on site, for any 
shift, at your convenience and be repeated days, weeks, or 
years later for new personnel.
Maintenance personnel can also train on editing and 
downloading real turbine software, trend parameters as they 
actually respond on the unit, and exercise the wide range of 
advanced analysis tools that are available to maintain the 
turbine. The training software can even be updated to reflect 
changes made on the real unit and be compared with the 
original code – it’s the real deal!
Availability
The Training Simulator is available for all Mark VI control 
systems applied to any gas or steam turbine with a generator 
or mechanical load. It is also available for power island 
applications, such as Heat Recovery Steam Generator (HRSG), 
and balance of plant applications, such as combined cycle 
plants. GE Energy can also provide an experienced instructor 
to teach a regular training course or a customized program at 
your site.
Benefits
•  Operators – Improved effectiveness in using screens, alarm 
management, and trending
•  Maintenance – Decreased time required to troubleshoot 
problems and maintain unit availability
•  Refresh Skills – Revisit basic tasks that are infrequently 
needed, but still important in the modern age of  
automated controls
•  Life Cycle Cost – A permanent, onsite, simulator to provide 
effective, ongoing training for the life of the control system
GE Energy
Energy Learning Center
fact sheet