Sterling Home Theater Server 882.000254.00 Manuel D’Utilisation

Page de 91
7/50D Plus or 7/50D Controller 
Chapter 3:  Installation 
36 
Setting Up the System 
Setting the Number of Stations and the Number of Pumps 
 
 
 
 
 
 
 
 
 
 
 
At the Station Summary screen (shown above), or at the Pump Summary screen: 
1.  Touch the icon for any station (or pump) and hold it for several seconds. (When the 
controller arrives from the factory, only one icon appears.) 
A Station n Operator screen similar to the following appears. (If you started at the 
Pump Summary screen, the Pump n Setup screen appears instead.)