operatIon
IMportant
IT IS RECOMMENDED THAT A QUALIFIED SERVICE TECHNICIAN 
PERFORM THE INITIAL FIRING OF THE BOILER. AT THIS TIME 
THE USER SHOULD NOT HESITATE TO ASK THE TECHNICIAN 
ANY QUESTIONS WHICH THEY MAY HAVE IN REGARD TO THE 
OPERATION AND MAINTENANCE OF THE BOILER.
BEFORE FILLING THE SYSTEM FOR OPERATION the hot water 
system  should  be  internally  cleaned  and  flushed  to  remove  any 
contaminants which may have accumulated during installation. See 
section of this manual titled SYSTEM CLEANING.
General
Never operate the heating elements without being certain the boiler 
is filled with water and a pressure relief valve is installed in the relief 
valve opening provided.
lwco
An  electronic  type  low  water  cutoff  is  provided  on  all  boilers  as 
standard equipment. The water probe is installed near the top of the 
tank to monitor the presence of water. The control circuit is opened if 
the water level is below this point.
power on/off
The pilot switch on the cabinet front permits the boiler to be turned 
on  and  off  without  having  to  operate  the  electrical  disconnect 
switch. Additional switches may be provided for manually operating 
contactor coils.
relief Valve
An ASME rated pressure relief valve is furnished with the boiler. A 
fitting for the relief valve is provided in the top of the boiler. A drain 
line from the relief valve should terminate near a suitable drain. Do 
not thread, plug, or cap the end of the drain line.
The pressure setting of the relief valve should not exceed the pressure 
capacity of any component in the system including the boiler.
hIGh teMperature lIMIts
automatic high limit
The  boiler  control  circuit  contains  two  high  temperature  cutoff 
switches.  This  device  shuts  off  the  heating  elements  if  excessive 
water  temperatures  are  reached. The  high  temperature  cutoff  has 
an adjustable range of 100° to 240°F and automatically resets on a 
drop of temperature.
Manual high limit (optional)
A manual reset high limit may be in the control circuit in addition 
to the automatic high limit previously described. The control has 
an adjustable range of 110°F to 290°F and activates and locks 
on a temperature increase. When the temperature declines the 
manual  reset  high  limit  can  be  reset. A  manual  reset  high  limit 
is  an  optional  substitution  for  one  of  the  automatic  high  limits 
mentioned above.
The manual reset button is located on the high limit switch which is 
located in the control panel.
fIllInG the BoIler
Refer to SYSTEM CLEANING section for preparing the system prior 
to final filling and operation.
Hard  Water:    in  areas  which  have  hard  water  it  may  be  desirable 
to fill the system with soft water and/or provide water treatment as 
recommended by a consultant familiar with local conditions. In this way 
harmful water scale build-up on the heating elements is minimized.
1. Close the boiler drain valve and system valves as necessary.
2. Open a vent in the highest point of the system to allow the air to escape.
3. Fully open the make-up water inlet valve. Fill the boiler and piping.
4. Close the vent as water starts to flow from the opening.  Place the 
make-up water valve in the desired position.  The boiler is now 
ready for START UP and TEMPERATURE REGULATION if being 
placed in operation for the first time.
InItIal start up
The following checks should be made by the installer when the boiler 
is placed into operation for the first time:
1. Check all factory and field made water and electrical connections 
for tightness.
  •  Repair water leaks and tighten electrical connections as necessary.
2. Turn  on  the  electrical  disconnect  switch  and  pilot  switch(es) 
mounted on the boiler cabinet.
3. Observe the operation of the boiler during the first heating cycle.
  •  Temperature control and contactor operation should be checked by 
allowing the boiler to come up to temperature and shutoff automatically.
teMperature reGulatIon
Always turn off the electricity at the electrical disconnect switch when 
making a temperature control adjustment.
It is suggested the temperature adjustment be turned to the lowest 
setting which satisfies the hot water requirements of the system.