Siemens TV Converter Box 611 Manuel D’Utilisation
Commissioning
9.2 Procedure
1. Disconnect the parallel connection
Only connect motor 1 to the power module.
2. Commission motor 1 as a single motor:
● Observe the information provided in the section titled "Commissioning checks performed
in a current-free state".
● Perform commissioning up to and including Point 8 as per the section titled
"Commissioning a single torque motor (SINUMERIK example)".
3. Traverse the axis and check that it is functioning correctly
4. Note the commutation angle offset of motor 1
MD 1016 (motor 1) = _ _ _ _ _ _ _ _ electrical degrees
5. Switch off and wait until the DC link has been discharged
6. Instead of motor 1, connect motor 2 to the power module
NOTICE
For a Janus configuration, interchange phases U and V (see PHB 1FW6, chapter titled
"Power connection for parallel operation").
7. Switch on with the pulse and controller enables deactivated
8. Determine the commutation angle offset of motor 2
● For an incremental measuring system or
● For an absolute measuring system; switch drive off (NCK reset)
● For an absolute measuring system; switch drive off (NCK reset)
9. Rotate the axis and check that it is functioning correctly
Does the axis rotate with a positive speed setpoint in the required direction?
● No → Change MD 32100 (direction of rotation)
Is the angle of rotation OK (specification = 10°→ angle = 10°)?
● No → Change MD 32100 (direction of rotation)
Is the angle of rotation OK (specification = 10°→ angle = 10°)?
10. Note the commutation angle offset of motor 2
MD 1016 (motor 2) = _ _ _ _ _ _ _ _ electrical degrees
1FW6 Built-in torque motors
Configuration Manual, 05/2009, 6SN1197-0AD00-0BP7
Configuration Manual, 05/2009, 6SN1197-0AD00-0BP7
183