Nexus 21 Marine Instruments 1510 Manuel D’Utilisation

Page de 3
NEXUS Autopilot 1510 summary of known checkpoints 
 
All Autopilot systems are complex systems dependant of a number of 
transducers and control algorithms why faultfinding needs to be done  
carefully to lead to correct remedy. 
 
Checkpoints: 
Power: 
It is essential to Power the Pilot servo and the Pump motor to get 
current enough without risk of voltages drops.  
Wireing can be effective by using Relay to get shorter length of 
cables. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
In a system without relay the Nexus system should never be 
powered up later than the AP Servo. 
 
 
 
To avoid ”backdrain” of current do not connect the Green wire 
(+12V) from the Nexus system. 
 
Wire thickness dependant of Power Cable length : 
 
Cable Length 
 Max. m.  (ft) 
Wire Area 
mm
2
 
Wire Area 
AWG 
          3   (10) 
2,5 
14 
          5   (16) 
12 
          7,5  (25) 
10 
          12   (40) 
*) Not nessesary 
NX2/Nexus 
Server 
Autopilot  
Servo 1510 
+12V 
+12V 
Optional power 
switch* for the 
AP Servo 
Relay 
Emergency 
switch for the 
AP Servo 
    0V 
    0V 
15A fuse
Power switch 
for the Server
3A fuse 
=Power Wires 
+       -
Battery