MPC Multiple Pass Commercial Boiler – Suggested Specifications
Heating, Ventilating and Air Conditioning
15500-1
2.1
GENERAL
A.
Reference is made to the clause entitled “Buy American Act – Balance of Payments Program –
Construction Materials” FAR 52.225-9. Notwithstanding a bidder’s right to offer identifiable
foreign construction material in its bid pursuant to FAR 52.225-9, the awarding authority does
not anticipate accepting an offer that includes foreign construction material.
Construction Materials” FAR 52.225-9. Notwithstanding a bidder’s right to offer identifiable
foreign construction material in its bid pursuant to FAR 52.225-9, the awarding authority does
not anticipate accepting an offer that includes foreign construction material.
B.
All manufacturers to be considered shall be required to meet or exceed scheduled I=B=R ca-
pacities and ratings and will be held to strict compliance with these contract specifications. For
factory assembled, packaged and firetested boilers, the complete boiler shall be approved as a
unit by Underwriters Laboratories.
pacities and ratings and will be held to strict compliance with these contract specifications. For
factory assembled, packaged and firetested boilers, the complete boiler shall be approved as a
unit by Underwriters Laboratories.
C.
Installing contractor shall include, as part of his contract, all charges and costs for boiler and
burner testing, start-up, checkout, adjusting, field and state inspections, including service con-
tracts for systems and equipment as here-in-after specified. Provide signed documentation to
the awarding authority for completion of specified procedures.
burner testing, start-up, checkout, adjusting, field and state inspections, including service con-
tracts for systems and equipment as here-in-after specified. Provide signed documentation to
the awarding authority for completion of specified procedures.
D.
Contractor shall obtain certificate of boiler inspection after boiler installation has been com-
pleted and pay all fees associated with such inspection. After receipt of certificate of inspec-
tion, installing contractor shall furnish a suitable glass front frame in which to place said cer-
tificate. Frame, with inspection certificate inserted therein, shall then be placed on or posted in
a suitable location within the boiler room in which the new boilers have been installed.
pleted and pay all fees associated with such inspection. After receipt of certificate of inspec-
tion, installing contractor shall furnish a suitable glass front frame in which to place said cer-
tificate. Frame, with inspection certificate inserted therein, shall then be placed on or posted in
a suitable location within the boiler room in which the new boilers have been installed.
E.
Installing contractor shall obtain from the boiler manufacturer pertinent (O&M) operating, test-
ing, and cleaning instructions for the boilers, burners, controls and safety devices furnished
with the Boiler(s).
ing, and cleaning instructions for the boilers, burners, controls and safety devices furnished
with the Boiler(s).
F.
It shall be the responsibility of the installing contractor to deliver O&M manuals, together with
complete wiring and piping diagrams, to the owner/user and to obtain a receipt for the instruc-
tions. The receipt shall be filed with the installation report.
complete wiring and piping diagrams, to the owner/user and to obtain a receipt for the instruc-
tions. The receipt shall be filed with the installation report.
G.
Written notification specifying the name, address, telephone number and available service pro-
gram of a third party burner service group as herein specified.
gram of a third party burner service group as herein specified.
2.2
WARRANTY
A.
The manufactured heating units, equipped with cast iron/metal push nipple connectors, the
boiler manufacturer shall warrant that the cast iron sections of each boiler will be free from de-
fects in material and workmanship under normal usage for a period of ten years from the date
of original installation.
boiler manufacturer shall warrant that the cast iron sections of each boiler will be free from de-
fects in material and workmanship under normal usage for a period of ten years from the date
of original installation.
1.
Burners: The burner manufacturer shall warrant each burner for a period of 15 months
from date of shipment.
from date of shipment.