MPC Multiple Pass Commercial Boiler – Suggested Specifications 
 
 
Heating, Ventilating and Air Conditioning 
15500-1 
2.1 
GENERAL  
A. 
Reference is made to the clause entitled “Buy American Act – Balance of Payments Program – 
Construction Materials”  FAR 52.225-9.  Notwithstanding a bidder’s right to offer identifiable 
foreign construction material in its bid pursuant to FAR 52.225-9, the awarding authority does 
not anticipate accepting an offer that includes foreign construction material. 
B. 
All  manufacturers  to  be  considered  shall  be  required  to  meet  or  exceed  scheduled  I=B=R  ca-
pacities and ratings and will be held to strict compliance with these contract specifications.  For 
factory assembled, packaged and firetested boilers, the complete boiler shall be approved as a 
unit by Underwriters Laboratories. 
C. 
Installing  contractor  shall  include,  as  part  of  his contract,  all charges and  costs for boiler  and 
burner testing, start-up, checkout, adjusting, field and state inspections, including service con-
tracts  for  systems  and  equipment  as  here-in-after  specified.    Provide  signed documentation to 
the awarding authority for completion of specified procedures. 
D. 
Contractor  shall  obtain  certificate  of  boiler  inspection  after  boiler  installation  has  been  com-
pleted  and pay all  fees associated with such inspection.  After receipt of certificate of inspec-
tion, installing contractor shall furnish a suitable glass front frame in which to place said cer-
tificate.  Frame, with inspection certificate inserted therein, shall then be placed on or posted in 
a suitable location within the boiler room in which the new boilers have been installed. 
E. 
Installing contractor shall obtain from the boiler manufacturer pertinent (O&M) operating, test-
ing,  and  cleaning  instructions  for  the  boilers,  burners,  controls  and  safety  devices  furnished 
with the Boiler(s). 
F. 
It shall be the responsibility of the installing contractor to deliver O&M manuals, together with 
complete wiring and piping diagrams, to the owner/user and to obtain a receipt for the instruc-
tions.  The receipt shall be filed with the installation report. 
G. 
Written notification specifying the name, address, telephone number and available service pro-
gram of a third party burner service group as herein specified. 
2.2 
WARRANTY 
A. 
The  manufactured  heating  units,  equipped  with  cast  iron/metal  push  nipple  connectors,  the 
boiler manufacturer shall warrant that the cast iron sections of each boiler will be free from de-
fects in material and workmanship under normal usage for a period of ten years from the date 
of original installation. 
1. 
Burners:  The burner manufacturer shall warrant each burner for a period of 15 months 
from date of shipment.