Burnham ES2 Manuel D’Utilisation

Page de 52
10
2.
  Screw the water supply manifold into the 
boiler outlet tapping “O.”
3.
  Orient the manifold with the relief valve on 
top.
4.
  Screw the relief valve into manifold tapping 
“RV”.
  
i        
  This installation is not complete until the 
             relief valve is installed.
  PIPE THE RELIEF VALVE DISCHARGE 
             to a location where it will not harm 
people or damage property. The relief valve may 
discharge scalding hot water or steam.
  BLOCKING THE RELIEF VALVE may 
             result in boiler explosion.
5.
  Screw the temperature-pressure gage into 
manifold tapping “G”.
6.
  Connect the system supply to the open end 
of the manifold "S" using a 1¼” male NPT 
fitting.
5.  CONNECT GAS PIPING
 Size gas piping according to Appendix C – Gas 
Piping
  SHUT OFF GAS SUPPLY before 
             servicing the boiler.
  ALL GAS PIPING MUST BE GAS 
             TIGHT.  Use gas rated thread compound 
on all threaded joints to avoid leaks, which may 
result in fire or explosion.
  SIZE GAS PIPING, regulators, valves, 
             and meters so as to provide an adequate 
gas flow and pressure to the boiler during 
operation. Failure to do so may cause poor 
combustion, noise, injury, or death.
1.
  Remove boiler door, locate gas valve and 
remove plastic shipping plug.
2.
  Thread a ¾" x 1½" nipple, a 90° street 
elbow, or a Honeywell flange onto the gas 
valve and pipe through the slot in the left 
jacket panel (Figure 5-a).  In Canada,  close 
nipples and street ells are not approved for 
use as gas piping.
3.
  Pipe through the left jacket panel, and 
complete drip leg as shown (Figure 5-a).
6.  CONNECT BOILER WATER PIPING
General system piping guidelines are included in 
Appendix D—System Piping.
Additionally, for this particular boiler install piping 
shown below (Figure 6-a).
6-a
1.
  Apply sealant to all threads.
RV
S
R
O
G
D
5-a