Thermador PCG486X Manuel De Montage
English 8
Detail A: (Front Face of Cabinet)
C
B
Corner Notch Detail
2 x 4 Corner
Support
Support
7-11/16”
30” Cooktop
36” Cooktop
48” Cooktop
A
29-7/8”
35-7/8”
47-7/8”
B
3/8”
3/8”
13/16”
C
0” (Control Panel Projecting 1-1/4” from Base
Cabinet Face)
11/16” (Notch Required for Standard 24” - Deep
Base Cabinet, Control Panel Projecting 9/16” from
Base Cabinet Face) 1-1/4” (Control Panel Flush to
Cabinet Face - Min. 24-9/16” - Deep Base Cabinet
Required)
Cabinet Face)
11/16” (Notch Required for Standard 24” - Deep
Base Cabinet, Control Panel Projecting 9/16” from
Base Cabinet Face) 1-1/4” (Control Panel Flush to
Cabinet Face - Min. 24-9/16” - Deep Base Cabinet
Required)
D
29-1/8”
35-1/8”
46-1/4”
Figure 5: Side View of Cooktop
25-3/8”
12”
1/2”
Side
Flange
7-5/8”
5-1/4” TO CENTERLINE OF
GAS INLET
1-1/4”
Cabinet face for installation with projecting control panel
Cabinet face for installation with flush control panel
* Low Back required when there is less than 12”
horizontal clearance from back of cooktop to combustible
material. With more than 12” of clearance, the Island
Trim may be used.
horizontal clearance from back of cooktop to combustible
material. With more than 12” of clearance, the Island
Trim may be used.
23-5/16”