FiveStar TTN275W Guide De Démarrage

Page de 11
STEP 15
 
 
CHECKLIST FOR OPEN BURNER INSTALLATION 
 
 
MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION. 
 
 
Gas supply is “on” 
 
 
Electric power is “on” 
 
 
Burner drip pans in position under burners 
 
 
Surface burners in position 
 
 
Burner pans in positions 
 
 
Burner grates in position 
 
 
Oven and broiler racks installed 
 
 
Surface burner ignition test 
 
 
Gas oven ignition test 
 
 
MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION 
 
 
 
 
Date Installed & Inspected __________________________________________________ 
 
Authorized Installer’s Signature  _____________________________________________ 
 
Please Print Name  ________________________________________________________ 
 
 
NOTE: Please leave this checklist, Use & Care manual and product registration 
card with the Homeowner.