Vent-a-Hood M46PSLDSS Manuel De Montage

Page de 6
Page 3
L154 0810B

Electrical


10" Round
Centerline
of Hood
6" Round

Electrical

Centerline
of Hood
Installation Details
1)  Read all instructions thoroughly before beginning installation. Note: These instructions apply to standard liners only. 
Custom liners may require additional specification consideration.
2)  When installing a MSLD wall mount liner (19 1/4” deep), it is recommended that the bottom edge of the liner be located 
no more than 24” - 27” from the cooking surface. For MPSLD wall mount liners (22 1/2” deep), it is recommended that 
the bottom edge of the liner be located no more than 27” - 30” from the cooking surface. Exceeding recommended 
mounting height may compromise performance.
3)  Install the duct from the outside of the home down to the location of the exhaust outlet on the top of the liner allowing 
room for the transition (if applicable). If a transition is used, install duct down to the location of the transition outlet 
plus 1”. This will allow the transition to engage 1” inside of duct. Consult the connection diagrams (below) for further 
details on exhaust outlet placement.
 
Use duct tape to seal all joints. A complete listing of available Vent-A-Hood ducting materials is included on the back 
page of this instruction sheet.
 
Transition heights are as follows:
Single Blower (M600): 
6” round duct will connect directly to the top of the liner.
Dual Blower (M1200): 
Included 10” round transition (VP566) is 9”  tall.
MSLD Liner
MPSLD Liner
M1200 Connection Diagram
Dual Blower
(Top View)
Single Blower
(Top View)
M600 Connection Diagram