Samsung RF24J9960S4 Manuel Du Propriétaire

Page de 180
English - 22
COMPLETING THE SET UP
Now that you have your new refrigerator installed in place, you are ready to set up and enjoy the features 
and functions of the appliance. By completing the following steps, your refrigerator should be fully 
operational.
1.  Make sure your refrigerator is in an appropriate location with reasonable clearance between it and the 
wall. Refer to installation instructions in this manual.
2.  Once the refrigerator is plugged in, make sure the interior light comes on when you open the doors.
3.  Set the Temperature control to the coldest temperature and wait for an hour. The freezer will get 
slightly chilled and the motor will run smoothly. Reset the refrigerator and freezer to the temperatures 
you want.
4.  After you plug the refrigerator in. It will take a few hours to reach the appropriate temperature. You can 
store food and drinks in the refrigerator after the temperature is suffi ciently cool.
If condensation or water drops appears on both sides of the fridge door’s central part, turn the 
Energy Saving mode off after removing the condensation.
(See the explanation of the Energy Saving button in USING THE CONTROL PANEL on page 24.)
DA68-03013A-12.indb   22
DA68-03013A-12.indb   22
2015. 4. 16.   
 10:59
2015. 4. 16.   
 10:59