GE GDT720S Manuel De Montage

Page de 48
PREPARE HOT WATER LINE
NOTE: GE recommends copper tubing for the water line, but if 
\RXFKRRVHWRXVHÀH[LEOHKRVHXVH*(·VWX28X326ÀH[LEOH
braided hose.
• The water supply line (3/8” copper tubing or flexible braided 
hose) may enter from either side, rear or floor within the 
shaded area shown in Figure F.
• The water supply line may pass through the same hole as the 
electrical cable and drain hose. Or, cut an additional 1-1/2" 
diameter hole to accommodate the water line. If power cord 
with plug is used, water line must not pass through power 
cord hole.
Figure F
Water Line Connection
• If using a flexible braided supply hose, label the hose with the 
installation date to use as reference. Flexible braided hoses 
should be replaced in 5 years.
• Turn off the water supply.
• Install a hand shut-off valve in an accessible location, such 
as under the sink. (Optional, but strongly recommended and 
may be required by local codes.)
• Water connection is on the left side of the dishwasher. Install 
the hot water inlet line, using no less than 3/8" copper tubing 
or a flexible braided hose. Route the line as shown in Figure F 
and extend forward at least 19" from rear wall. 
• Adjust water heater for 120°F to 140°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.
Turn page to begin dishwasher installation.
6"
4"
Cabinet Face
Shut-off
Valve
2" From Floor
19" From Wall
2"
From
Cabinet
1-1/2" Dia.
Hole
Hot
Installation Preparation
5
CAUTION:
Do not remove wood base until you are ready to install the 
dishwasher. The dishwasher will tip over when the door is 
opened if base is removed.