Mitsubishi Electronics A1SD75M1/M2/M3 Manuel D’Utilisation
11 - 43 11 - 43
MELSOFT
11. POSITIONING DEBUGGING
11.2.8 Torque control test
PURPOSE
Perform the torque control test to determine the appropriate torque.
The torque control test can be made only when the AD75M# is selected in Change
AD75 model.
The torque control test can be made only when the AD75M# is selected in Change
AD75 model.
BASIC OPERATION
1. Perform the basic operation in Section 11.1.2 to start operation monitor.
2. Click the [Online]
2. Click the [Online]
→ [Test] → [Test start] menu (
).
3. Click the "OK" button in the test mode start confirmation dialog box.
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Click the <<Torque>> tab in the Test data set dialog box.
6. Set the torque output value or new torque value.
7. When you have set the torque output value, click the "Output set req." button.
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Click the <<Torque>> tab in the Test data set dialog box.
6. Set the torque output value or new torque value.
7. When you have set the torque output value, click the "Output set req." button.
When you have set a new torque value, click the "Change req." button.
8. To end the torque control test, click the [Online]
→ [Test] → [Test start] menu (
).
9. Clicking the "OK" button in the test mode end confirmation dialog box returns to
the operation monitor status.
DISPLAY/SETTING SCREEN