Cal Flame Barbecue Island Manuel D’Utilisation
10
Installation /
Assemb
ly
2009 Barbecue Islands
LTR20091036, Rev. A
www.calspas.com
Quickly fill one portion of the seam line with the epoxy mixture.
8.
Remove the excess epoxy material from the seam line using a
razor blade.
Let the epoxy material cure for five minutes.
Let the epoxy material cure for five minutes.
9.
Pour a small amount of epoxy and hardener separately on a piece
10.
of cardboard.
Mix the epoxy material well with the hardener.
Mix the epoxy material well with the hardener.
11.
Quickly apply the epoxy mixture to the seam line. Remove the
12.
excess epoxy material from the seam line using a razor blade.
Let the epoxy material cure for five minutes.
Let the epoxy material cure for five minutes.
13.
Repeat the previous steps until all the seam line is filled with epoxy
14.
mixture.
Clean the surface of the seam line with acetone.
Clean the surface of the seam line with acetone.
15.
Griddle and Griddle Storage
Similar to installing a drawer, you need to have a cutout on your bar-
becue island as shown below. Align the enclosure as shown, opening
facing out. Make sure the enclosure is aligned horizontally. Tighten the
mounting screws on both side of the enclosure to lock the enclosure in
place. Slide the griddle into the enclosure to test the installation.