Kobe Range Hoods CH7942SQ Manuel D’Utilisation

Page de 33
 
 
UNDER THE CABINET INSTALLATION – TOP VENT 
 
 
Preparation before Installation 
 
NOTE:  TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE 
VENT OPENING. 
 
-  Decide the location of the venting pipe from the hood to the outside.  Refer to Figure 1. 
 
-  A straight, short venting run will allow the hood to perform more efficiently. 
  -  Try to avoid as many transitions, elbows, and long run as possible.  This may reduce 
the performance of the hood. 
- Temporarily wire the hood to test for proper operation before installing. 
- Peel protective film off the hood (if any).  
- For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler 
strips (not included) on each side.  Refer to Figure 2. 
- Measure and create access opening for electrical wires under the cabinet. 
- Cut the multi duct exhaust according to the size of the venting pipe.  Refer to Figure 3. 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                   Figure 1                                                         Figure 2 
 
                                                                                                                            Figure 3 
 
         
     
     
 
               6” Round Vent                       7” Round Vent                 3-1/4” x 10” Vent 
 
 
Hood Installation 
 
CAUTION: If required to move the cooking range to install the hood, turn OFF the power on an 
electric range at the main electrical box.  SHUT OFF THE GAS BEFORE MOVING A GAS 
RANGE.