Kobe Range Hoods CH7930SQ Manuel D’Utilisation

Page de 33
 
10 
 
STAND ALONE INSTALLATION – TOP VENT 
 
 
***This installation only applied with the purchase of an optional duct cover (Model No. CH1120DC). 
 
Preparation before Installation 
 
NOTE:  TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE   
VENT OPENING. 
-  Decide the location of the venting pipe from the hood to the outside.  Refer to Figure 13. 
-  A straight, short venting run will allow the hood to perform more efficiently. 
-  Try to avoid as many transitions, elbows, and long run as possible.  This may reduce 
the performance of the hood. 
-  Use duct tape to seal the joints between pipe sections. 
-  If necessary, prepare back wall frame with cross framing lumber for secure installation. 
-  Using references on Table 2 and measurements on page 21-22, decide the level of the 
lumber.  Refer to Figure 14.   
 
Hood Preparation before Installation 
 
-  Temporarily wire the hood to test for proper operation before installing. 
-  Peel protective film off the hood and the duct cover (if any). 
-  Cut the multi vent exhaust according to the size of the venting pipe.  Refer to Figure 15. 
 
 
 
 
 
 
 
 
 
 
 
                                               Figure 13                                                   Figure 14 
                                                                                                                               Figure 15 
 
                    
     
     
 
                         6” Round Vent                       7” Round Vent                 3-1/4” x 10” Vent