INSTALLATION & SET-UP  
SCOPE OF WORK GUIDE 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SCOPE OF WORK 
 
KROGER/GENERAL CONTRACTOR RESPONSIBILITIES: 
•  Receive, Uncrate and Set in Place the RBC Blast Chiller 
•  Electrical Hook-up.  RBC100 Provided with a Grounding Type Cord without a Plug.  
•  Provide Dedicated 220/60/1 Volt, 4 Wire, 20amp Grounded Circuit with Receptacle  
•  Drain is Required 
• 
Any shortages and/or visible damage must be marked on the freight bill at the time of 
delivery. If damages are found, the local office of the carrier must be notified at once 
and an inspection requested.  Also, notify Hobart Customer Service. If the delivery 
receipt is signed clear and concealed damage is found, the carrier must be notified 
and inspection requested within 15 days of delivery. 
DAMAGED SHIPMENTS OR SHORTAGES 
 
Hobart Corporation will take care of filing carrier claims for lost or damaged shipments. 
The local Hobart office can ascertain if the unit can be repaired in the field or at their 
location.  Should replacement of unit(s) or parts be necessary, contact your Hobart 
representative or the Customer Service Department. 
 
INSTALLING HOBART OFFICE RESPONSIBILITIES: 
•  Verify Unit and All Accessories Have Been Properly Assembled. 
•  Perform Startup of RBC Chiller 
•  Set Date and Time, Verify Printer Paper is Loaded and Operating Properly. 
•  Start Up Unit and Test Operation 
•  Customer Demo/Training* 
o
  Demonstrate Controls, Cleaning and Maintenance Procedures to Deli Personnel 
o
  Loading Printer Paper 
 
* For details, Refer to the Operator Manual, Blast Chill Guide, Training Guide or 
Operator Training Video available @ 
  
RBC50 & RBC100 
TRAULSEN BLAST CHILLER 
 
Procedures and Scope of Work for installing RBC50 & 
RBC100 Blast Chillers. 
 
Model RBC100 ships standard with the optional bottom 
mounted electric condensate evaporative pan kit for 
condensate removal. The standard drain port location is at 
the rear of the unit. To be installed if no drain is available. 
 
The RBC50 & RBC100 are included in the Retail 
Installation Credit (WRN Claim) program.  
 
Unit ships with standard legs. Casters are available at 
additional cost upon request.