CFM GEF10 Fascicule

Page de 2
S
SE
EF
F,,  P
PE
EF
F  &
&  G
GE
EF
F  E
E
X
XH
HA
AU
US
ST
T
F
F
A
AN
NS
S
D
D
IIR
RE
EC
CT
T
D
D
R
RIIV
VE
E
R
RE
EA
AD
D  A
AN
ND
D  S
SA
AV
VE
E  T
TH
HE
ES
SE
E  IIN
NS
ST
TR
RU
UC
CT
TIIO
ON
NS
S  F
FO
OR
R  F
FU
UT
TU
UR
RE
E  R
RE
EF
FE
ER
RE
EN
NC
CE
E
R
RE
EA
AD
D  A
AN
ND
D  S
SA
AV
VE
E  T
TH
HE
ES
SE
E  IIN
NS
ST
TR
RU
UC
CT
TIIO
ON
NS
S  F
FO
OR
R  F
FU
UT
TU
UR
RE
E  R
RE
EF
FE
ER
RE
EN
NC
CE
E
A
AS
SS
SE
EM
MB
BL
LY
Y  IIN
NS
ST
TR
RU
UC
CT
TIIO
ON
NS
S
M
MO
OD
DE
EL
LS
S  S
SE
EF
F--1
10
0  T
TH
HR
RO
OU
UG
GH
H  S
SE
EF
F--2
24
4
C
Co
on
ntte
en
ntts
s::   Pre-assembled guard mount fan, shutter, shutter
mounting hardware kit, package of mounting screws.
To mount shutter to fan assembly:
1.
Shutter mounting hardware kit includes: 4 rubber vibration
isolators, 4 nylon inserts, 4 screws (#12 x 1”) and 4 rubberized
washers.
2.
Insert screws into washers - rubber side down.
3.
Place nylon inserts into square holes of corner gussets at
rear of shutter.
4.
Place shutter face down (gusset side up). Center vibration
isolators over nylon inserts.
5.
Place fan assembly on shutter so that wire hooks on fan
guard are centered over vibration isolators and nylon
inserts. Junction box must be positioned at bottom with
shutter blades opening upwards.
6.
Secure fan assembly to shutter using screws and washers.
7.
Ensure that fasteners are snug. Do not over tighten to
avoid stripping nylon inserts.
M
MO
OD
DE
EL
L  S
SE
EF
F--3
30
0
C
Co
on
ntte
en
ntts
s:: Pre-assembled guard mount fan, shutter, shutter
mounting hardware kit, package of mounting screws.
To mount shutter to fan assembly:
1.
Shutter mounting hardware kit includes: 4 rubber vibration
isolators, 8 rubber inserts, 8 screws (#8-32 x 11/2”) and 8
rubberized washers.
2.
Insert screws into washers - rubber side down.
3.
Place rubber inserts into round holes of corner gussets at
rear of shutter. It may be necessary to twist and push or tap
lightly to seat rubber inserts properly.
4.
Place shutter face down (gusset side up). Center vibration
isolators over rubber inserts.
5.
Place fan assembly on shutter so that wire hooks on fan
guard are centered over vibration isolators and nylon
inserts. Junction box must be positioned at bottom with
shutter blades opening upwards.
6.
Secure fan assembly to shutter using screws and washers.
7.
Ensure that fasteners are snug. Do not over tighten to
avoid pulling out rubber inserts.
M
MO
OD
DE
EL
LS
S  P
PE
EF
F--1
10
0  T
TH
HR
RO
OU
UG
GH
H  P
PE
EF
F--3
30
0
C
Co
on
ntte
en
ntts
s:: Pre-assembled panel mount fan.
M
MO
OD
DE
EL
LS
S  G
GE
EF
F--1
10
0  T
TH
HR
RO
OU
UG
GH
H  G
GE
EF
F--3
30
0
C
Co
on
ntte
en
ntts
s:: Pre-assembled guard mount fan.
IIN
NS
ST
TA
AL
LL
LA
AT
TIIO
ON
N  &
&  M
MA
AIIN
NT
TE
EN
NA
AN
NC
CE
E  G
GU
UIID
DE
E
C
CA
AU
UT
TIIO
ON
N!!      T
TH
HE
ES
SE
E   F
FA
AN
NS
S   A
AR
RE
E   D
DE
ES
SIIG
GN
NE
ED
D   F
FO
OR
R   G
GE
EN
NE
ER
RA
AL
L
V
VE
EN
NT
TIIL
LA
AT
TIIO
ON
N  U
US
SE
E  O
ON
NL
LY
Y..    D
DO
O  N
NO
OT
T  U
US
SE
E  T
TO
O  E
EX
XH
HA
AU
US
ST
T  C
CO
OR
RR
RO
O--
S
SIIV
VE
E,,  H
HA
AZ
ZA
AR
RD
DO
OU
US
S  O
OR
R  E
EX
XP
PL
LO
OS
SIIV
VE
E  M
MA
AT
TE
ER
RIIA
AL
LS
S  A
AN
ND
D  V
VA
AP
PO
OR
RS
S..
B
BE
EF
FO
OR
RE
E  IIN
NS
ST
TA
AL
LL
LA
AT
TIIO
ON
N
W
WA
AR
RN
NIIN
NG
G!!    T
TO
O  R
RE
ED
DU
UC
CE
E  T
TH
HE
E  R
RIIS
SK
K  O
OF
F  F
FIIR
RE
E,,  E
EL
LE
EC
CT
TR
RIIC
CA
AL
L
S
SH
HO
OC
CK
K,,  O
OR
R  IIN
NJ
JU
UR
RY
Y  T
TO
O  P
PE
ER
RS
SO
ON
NS
S,,  P
PL
LE
EA
AS
SE
E  O
OB
BS
SE
ER
RV
VE
E  T
TH
HE
E
F
FO
OL
LL
LO
OW
WIIN
NG
G  S
SA
AF
FE
ET
TY
Y  P
PR
RE
EC
CA
AU
UT
TIIO
ON
NS
S::
1.
T
Th
hiis
s  ffa
an
n  h
ha
as
s  rro
otta
attiin
ng
g  p
pa
arrtts
s!! Turn impeller by hand to ensure
that it rotates freely.
2.
Ensure that electrical service to fan is locked in the
“O
OF
FF
F” position to prevent power from being switched on
accidentally.
When the service disconnecting means
cannot be locked, securely fasten a prominent warning
device such as a tag to service panel.
3.
Do not re-establish power supply until fan and activation
device are completely installed.
4.
Installation work, including electrical wiring, must be
performed by a qualified person in accordance with all
applicable codes and standards, including local fire codes.
5.
Check voltage at fan to see that it corresponds to fan motor
nameplate rating.
6.
Fan is intended to be hard wired to a properly rated
electrical circuit, and must be properly grounded. Do
not use an extension cord.
7.
Fan motor is equipped with thermal overload protection,
which causes fan to shut off automatically if motor overheats.
If this should happen, immediately disconnect and lock power
supply to fan. D
Do
o  n
no
ott  a
atttte
em
mp
ptt  tto
o  w
wo
orrk
k  o
on
n  ffa
an
n  w
wiitth
ho
ou
utt  d
diis
sc
co
on
n--
n
ne
ec
cttiin
ng
g  p
po
ow
we
err  s
su
up
pp
plly
y;;  ffa
an
n  m
ma
ay
y  rre
es
stta
arrtt  w
wiitth
ho
ou
utt  w
wa
arrn
niin
ng
g!!
8.
Fan should not be turned on and off rapidly.
9.
Do not use fan with a solid state speed control device.
10. Do not allow fan to become wet or damp.
11. Do not block air intake or exhaust from fan.
12. Do not allow foreign objects to enter fan and come in
contact with fan blades.
S
SP
PE
EE
ED
D  S
SE
EL
LE
EC
CT
TO
OR
R  S
SW
WIIT
TC
CH
H  
Fan is equipped with either a 2-speed or 3-speed pull chain switch,
allowing user to select desired airflow. Pulling a speed selector
switch repeatedly will cause fan speed to cycle as follows:
2
2--S
Sp
pe
ee
ed
d  S
Sw
wiittc
ch
h::
OFF – FIRST SPEED – OFF – SECOND SPEED – OFF
3
3--S
Sp
pe
ee
ed
d  S
Sw
wiittc
ch
h::  
OFF – HIGH – MEDIUM – LOW – OFF 
S
SE
EF
F  S
SH
HU
UT
TT
TE
ER
R  M
MO
OU
UN
NT
T  F
FA
AN
N
P
PE
EF
F  P
PA
AN
NE
EL
L  M
MO
OU
UN
NT
T  F
FA
AN
N
G
GE
EF
F  G
GU
UA
AR
RD
D  M
MO
OU
UN
NT
T  F
FA
AN
N