GE Monogram GFK-1115 Manuel D’Utilisation

Page de 175
Index
GFK-1115 
Index-1
A
Accessing the Connection List, 5-2
Alarm field, 6-48
Alarm group definition, 6-58
Alarm list, 6-48
Alarm system
activation, 6-60
editing, 6-58
B
Base picture, 6-53
Baud Rate, 4-7
Baud rate selection, A-4
Binding pictures
error picture, 3-35
overview, 3-32
Pict_1 picture, 3-37
picture for a communications error, 3-33
picture list directory organization, 3-38
process, 3-34
start-up picture, 3-36
to the project, 6-52
Blocking distance, 4-8
Broadcast control data length, 4-7
Bus address
assigned to C400 Controller, 4-4
Bus connections, A-5
Bus error count, 4-4
Bus length, A-4
Bus scan time, 4-4
C
Cabling
cable types, A-2
diagrams, A-6
Genius communications, A-2
recommended cable types, A-3
Calling the setup program, 3-2
Catalog numbers
C400 Controller, 2-1
Genius products, 1-4, A-4
PCS, 1-3
PLCs, 4-4
RS-232 to RS-422 converter, 4-11
Command timer, 4-8
Communication error
picture for, 6-50, 6-52
Compiling a project, 3-39, 6-64
Configuration of the PLC interface, 4-10
Connecting power to Panel Controller, 2-2
Connecting the PLC and the Panel, 3-42
Connection editor, 4-2
Connection List, 1-2
accessing, 5-2
data type conversions, 5-12
deleting connections, 5-5
editing protocol parameters, 5-5
editing the Variable Assignment Table, 5-6
Editing/inserting connections, 5-4
elements, 5-3
function keys, 5-3
selecting the connection, 6-19
Connections, 6-61
selection, 6-19
to C400, 2-5
Context-sensitive Help screens, 3-7
Creating, 3-10
Creating a project, 6-16
Creating pictures, 3-21
D
Data interface service, 4-8
Data response times, 4-8
Data type conversions, 5-12
Defining alarms, 6-59
Deleting connections, 5-5
Deleting variable assignments, 5-10
Demo project
creating, 6-16, 6-18
creating pictures, 6-23
defining key assignments, 6-22
description, 6-7
downloading, 6-4
general information, 6-2
required hardware, 6-3
selecting the connection, 6-19
Device number switch, 2-7
Document conventions, 1-5
DOS box
executing PCS in, 1-3
Downloading the project to the Panel, 3-40
E
Editing protocol parameters for a connection, 5-
5
Editing the Variable Assignment Table, 5-6
Editing/inserting connections, 5-4
Editing/inserting variable assignments, 5-8
Elements of the VAT, 5-6
Error picture, 6-50, 6-52
Errors, 6-64
Errors/troubleshooting
errors during installation, B-2
errors during program start, B-3
errors while working in PCS, B-4
Exiting PCS, 3-44