Fujitsu B120 Manuel D’Utilisation

Page de 68
Preparation for use and operation
Unlocking/locking the tower server
24
A26361-K646-Z102-1-7619
Enabling access to the hard disk drives
4
3
2
1
Ê 
Unlock the server (1).
Ê 
Slide up the drive cover as far as possible (2).
Ê 
Remove the hard disk cover toward the front (3 + 4).
The hard disk cover is remounted and the server connected in the reverse order.