Fujitsu B120 Manuel D’Utilisation

Page de 68
Preparation for use and operation
Switching the server on and off
28
A26361-K646-Z102-1-7619
Server is switched off
The main switch (a) is in position 0 and the power-on indicator does not light. The ON/OFF switch
(b) is inoperative. The screen socket on the server is dead.
Server is ready for operation (stand-by state)
The main switch (a) is in position I and the power-on indicator (c) does not light. The server can be
switched on with the ON/OFF switch (b) or a signal. The screen socket on the server is live.
Server is switched on
The main switch (a) is in position I and the power-on indicator (c) does not light up. The server can
be made ready for operation with the ON/OFF switch (b) or a signal. The screen socket on the
server is live.
Other switch-on methods
In addition to the ON/OFF switch, the server can be switched on in the following ways:
• 
Specified switch-on time/switch-off time
The server is switched on or off at a time specified in the
ServerView
program.
• 
Ring indicator
The server is switched on via an internal or external modem.
• 
Wakeup On LAN (WOL)
The server is switched on by a command via the LAN (Magic Package).
• 
After power failure
The server is switched on after a power failure (rebooted).