Toshiba 1000 Series Manuel D’Utilisation

Page de 60
5
2.2 System Configuration
The UPS device and the internal backup battery make up the system. Depending on
the site and load requirements of the installation, available options may be utilized to
create a tailored solution.
Planning a UPS system should include the following considerations:
•  The total demand of the protected system shall dictate the output power rating
(VA). Allow a margin for future expansion or calculation inaccuracies from
measuring power requirements.
•  Backup time needed will determine the battery size needed. If the load is less
than the UPS nominal power rating then the actual backup time will be longer.
•  The following options are available:
•  External Battery Cabinets, and
•  Connectivity options (Remote Contact, SNMP/WEB card).
The following UPS models are available.
Model
Backup time Internal
batteries
Recharge time to 90%
capacity
UPS 1000VA
7 min
4 hours
UPS 1200VA
6 min
4 hours
Additional External Battery Cabinets are available if more back-up time is needed.