3.3  Connection to main supply and loads (1000 – 1200 VA)
•  Ensure that the UPS is disconnected from the main supply and loads while
connecting the External Battery Cabinets.
•  Use the battery cable supplied with the External Battery Cabinet to connect the
External Battery Cabinet to the UPS. If more than one battery cabinet is
required, use the supplied cable.
•  A familiarity with the UPS parameter settings is required if changing the Battery
pack quantity as when using the External Battery Cabinets section 4.3 Front
•  Connect the input cable to the UPS and connect the other end to a grounded
outlet. The batteries will charge automatically when connected to the main
supply.
The UPS may be used immediately to power a load. However, the maximum
battery back-up time will not be available until the recommended 8-hour
minimum charge time has completed.
•  If a Site Wiring Fault is displayed, rotate the connector (Schuko – electric
contact) (see section 5.6 Troubleshooting).
After charging the UPS connect the load to the UPS (see the example in
Figure 2 Example of Installation of Plug & Play products.
•  Do not connect any devices to the UPS that may cause overloading of the UPS
or that draws half-wave rectified current, such as hair dryers or vacuum cleaners.
panel) connections are used.
•  The installation is now complete.