NEC 128/384 Manuel D’Utilisation

Page de 154
NDA-24230 Issue 2.0
Page B-3
VisuaLink 128/384 User Guide
Appendix B
F/W download On Screen Display (OSD)
Connection to the version up center.
The system shouldn’t be powered down when
the initialize screen starts.  Otherwise boot up
program will be erased.
Maintenance being performed from the Center.
  Please wait …..
  Start to download program.
Maintenance being performed from the Center.
  Please wait …..
  Your version is the same as the Center.
In case of same
version.
The system shouldn’t be powered down when
the initialize screen starts.  Otherwise boot up
program will be erased.
Maintenance being performed from the Center.
  Please wait …..
  Start to download program
  Download in progress
100/999
 
Disconnected the line.
     TIME  :  00H 00M 00S
016 Normal clearing
The system shouldn’t be powered down when
the initialize screen starts.  Otherwise boot up
program will be erased.
Maintenance being performed from the Center.
  Please wait …..
  Acquired program from the Center.